Renewable Energy StoriesRenewable Energy Stories
  • Home
  • Solar News
    • Utility Scale
    • Rooftop Solar
    • Manufacturing
  • Other Renewables
    • Wind Energy
    • Biofuels
    • Hydro Power
    • Others
  • Storage
    • Lithium-Ion
    • Large Storage (100 kW+)
    • Small Storage
    • Battery Technology
  • Research
  • Finance
  • Events
  • Advertise
Facebook Twitter Instagram
India Edition | South East Asia Edition
Facebook Twitter LinkedIn
Renewable Energy StoriesRenewable Energy Stories
  • Home
  • Solar News
    • Utility Scale
    • Rooftop Solar
    • Manufacturing
  • Other Renewables
    • Wind Energy
    • Biofuels
    • Hydro Power
    • Others
  • Storage
    • Lithium-Ion
    • Large Storage (100 kW+)
    • Small Storage
    • Battery Technology
  • Research
  • Finance
  • Events
  • Advertise
Renewable Energy StoriesRenewable Energy Stories
Home » BESIX Wins Oman Contract For Marsa LNG Solar-Powered Bunkering Hub
Solar News

BESIX Wins Oman Contract For Marsa LNG Solar-Powered Bunkering Hub

By Chitrika Thu, May 1st, 2025
BESIX Wins Oman Contract For Marsa LNG Solar-Powered Bunkering Hub
BESIX Wins Oman Contract For Marsa LNG Solar-Powered Bunkering Hub
Share
Facebook Twitter LinkedIn Pinterest Email

BESIX awarded a marine infrastructure project at SOHAR Port and Freezone, Oman for the construction of a Liquefied Natural Gas (LNG) jetty which has comprehensive shore protection, and an advanced drainage network.

The new LNG jetty will form a key part of the infrastructure supporting the Marsa LNG project — the Middle East’s first LNG bunkering hub to be fully powered by solar energy. By enabling the safe and efficient transfer of cleaner marine fuel, the jetty plays an important role in supporting the project’s broader sustainability objectives.

This marks BESIX’s return to the Omani market, broadening its current regional activities beyond the UAE, Saudi Arabia, and Qatar. The contract will be executed on a fast-track basis and led solely by BESIX, drawing on the company’s marine expertise and proven track record in the Sultanate. Past projects include marine works at the Duqm refinery and Sultan Qaboos Port, the seawater intake system in Barka, and earlier developments at Sohar Port itself. Construction is set to begin in summer 2025 and will run for approximately 16 months.

Emile Hoogsteden, CEO, SOHAR Port: “Partnering with BESIX on this strategic development reinforces our commitment to advancing sustainable energy solutions in the region. The new LNG jetty is a cornerstone of the Marsa LNG project, and it exemplifies the kind of forward-thinking infrastructure that positions SOHAR as a leader in green maritime logistics.”

Peter Lembrechts, General Manager, BESIX Middle East: “This contract represents the trusted collaboration we first established with Sohar Port years ago. We look forward to delivering this project with the same focus, reliability, and excellence that define BESIX across Oman and the Gulf.”

BESIX is a world specialist in the design and construction of marine infrastructures, including jetties like this one. In recent decades, BESIX has successfully delivered jetties around the world—from the South Hook Terminal in the UK to Wheatstone LNG in Australia, LNG Kitimat in Canada, the LNG import terminal in Bahrain, and Ain Sokhna LNG in Egypt.

Egypt Emile Hoogsteden Jetty LNG Marsa SOHAR Port Solar-Fueled Hub UAE
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Chitrika

Related Posts

450MW Solar Trackers Headed to Duqm for Green Hydrogen Project

June 12, 2025

Ducab Plans to Recycle More Metals as Demand Grows

June 11, 2025

DEWA Solar Park Adds 800 MW Power, Capacity Hits 3.86 GW

June 10, 2025

Leave A Reply Cancel Reply

seven − 5 =

Latest News
  • L&T to Build New Power Grid Systems in the Middle East
  • 450MW Solar Trackers Headed to Duqm for Green Hydrogen Project
  • Ducab Plans to Recycle More Metals as Demand Grows
  • DEWA Solar Park Adds 800 MW Power, Capacity Hits 3.86 GW
  • Clean Energy Funding In Middle East Set To Rise: IEA
Solar News

450MW Solar Trackers Headed to Duqm for Green Hydrogen Project

June 12, 2025

DEWA Solar Park Adds 800 MW Power, Capacity Hits 3.86 GW

June 10, 2025

Clean Energy Funding In Middle East Set To Rise: IEA

June 9, 2025

LONGi, POWERCHINA To Supply Modules For Oman Solar Project

June 9, 2025
ADVERTISE WITH US

We are the no.1 B2B solar media in India. With SaurEnergy, you have a full menu of options to pick from to reach the largest audience for your products and services.

To get in touch, contact us at info[at]saurenergy.com

Or Call at 9891147599 / 8802315631

Facebook Twitter Instagram YouTube LinkedIn WhatsApp
Latest News
  • L&T to Build New Power Grid Systems in the Middle East
  • 450MW Solar Trackers Headed to Duqm for Green Hydrogen Project
  • Ducab Plans to Recycle More Metals as Demand Grows
  • DEWA Solar Park Adds 800 MW Power, Capacity Hits 3.86 GW
  • Clean Energy Funding In Middle East Set To Rise: IEA
SAURENERGY NEWSLETTER

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

    [mc4wp_checkbox]

    © 2025 Saurenergy International.

    Type above and press Enter to search. Press Esc to cancel.

    Newsletter Subscription

      [mc4wp_checkbox]