Renewable Energy StoriesRenewable Energy Stories
  • Home
  • Solar News
    • Utility Scale
    • Rooftop Solar
    • Manufacturing
  • Other Renewables
    • Wind Energy
    • Biofuels
    • Hydro Power
    • Others
  • Storage
    • Lithium-Ion
    • Large Storage (100 kW+)
    • Small Storage
    • Battery Technology
  • Research
  • Finance
  • Events
  • Advertise
Facebook Twitter Instagram
India Edition | South East Asia Edition
Facebook Twitter LinkedIn
Renewable Energy StoriesRenewable Energy Stories
  • Home
  • Solar News
    • Utility Scale
    • Rooftop Solar
    • Manufacturing
  • Other Renewables
    • Wind Energy
    • Biofuels
    • Hydro Power
    • Others
  • Storage
    • Lithium-Ion
    • Large Storage (100 kW+)
    • Small Storage
    • Battery Technology
  • Research
  • Finance
  • Events
  • Advertise
Renewable Energy StoriesRenewable Energy Stories
Home » BESIX Wins Oman Contract For Marsa LNG Solar-Powered Bunkering Hub
Solar News

BESIX Wins Oman Contract For Marsa LNG Solar-Powered Bunkering Hub

By Chitrika Thu, May 1st, 2025
BESIX Wins Oman Contract For Marsa LNG Solar-Powered Bunkering Hub
BESIX Wins Oman Contract For Marsa LNG Solar-Powered Bunkering Hub
Share
Facebook Twitter LinkedIn Pinterest Email

BESIX awarded a marine infrastructure project at SOHAR Port and Freezone, Oman for the construction of a Liquefied Natural Gas (LNG) jetty which has comprehensive shore protection, and an advanced drainage network.

The new LNG jetty will form a key part of the infrastructure supporting the Marsa LNG project — the Middle East’s first LNG bunkering hub to be fully powered by solar energy. By enabling the safe and efficient transfer of cleaner marine fuel, the jetty plays an important role in supporting the project’s broader sustainability objectives.

This marks BESIX’s return to the Omani market, broadening its current regional activities beyond the UAE, Saudi Arabia, and Qatar. The contract will be executed on a fast-track basis and led solely by BESIX, drawing on the company’s marine expertise and proven track record in the Sultanate. Past projects include marine works at the Duqm refinery and Sultan Qaboos Port, the seawater intake system in Barka, and earlier developments at Sohar Port itself. Construction is set to begin in summer 2025 and will run for approximately 16 months.

Emile Hoogsteden, CEO, SOHAR Port: “Partnering with BESIX on this strategic development reinforces our commitment to advancing sustainable energy solutions in the region. The new LNG jetty is a cornerstone of the Marsa LNG project, and it exemplifies the kind of forward-thinking infrastructure that positions SOHAR as a leader in green maritime logistics.”

Peter Lembrechts, General Manager, BESIX Middle East: “This contract represents the trusted collaboration we first established with Sohar Port years ago. We look forward to delivering this project with the same focus, reliability, and excellence that define BESIX across Oman and the Gulf.”

BESIX is a world specialist in the design and construction of marine infrastructures, including jetties like this one. In recent decades, BESIX has successfully delivered jetties around the world—from the South Hook Terminal in the UK to Wheatstone LNG in Australia, LNG Kitimat in Canada, the LNG import terminal in Bahrain, and Ain Sokhna LNG in Egypt.

Egypt Emile Hoogsteden Jetty LNG Marsa SOHAR Port Solar-Fueled Hub UAE
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Chitrika

Related Posts

ADB, ACWA Ink $51Mn Loan For Uzbekistan Wind-BESS Project

September 8, 2025

ACWA Power, Syria Ink Deal to Develop 2.5 GW Solar, Wind Projects

September 5, 2025

EGP 136.3 bn Plan to Boost Renewable Energy and Electricity Sector in Egypt

September 4, 2025

Leave A Reply Cancel Reply

four × two =

Latest News
  • ADB, ACWA Ink $51Mn Loan For Uzbekistan Wind-BESS Project
  • Saudi Arabia Breaks Battery Storage Cost Barriers with $73-75/kWh Milestone
  • Kazakhstan, AIIB Ink $6 Bn Green Energy & Infrastructure Pact
  • ACWA Power, Syria Ink Deal to Develop 2.5 GW Solar, Wind Projects
  • EGP 136.3 bn Plan to Boost Renewable Energy and Electricity Sector in Egypt
Solar News

ADB, ACWA Ink $51Mn Loan For Uzbekistan Wind-BESS Project

September 8, 2025

ACWA Power, Syria Ink Deal to Develop 2.5 GW Solar, Wind Projects

September 5, 2025

EGP 136.3 bn Plan to Boost Renewable Energy and Electricity Sector in Egypt

September 4, 2025

Kazakhstan Sees Inauguration Of $142M Wind Farm By ERG

September 4, 2025
ADVERTISE WITH US

We are the no.1 B2B solar media in India. With SaurEnergy, you have a full menu of options to pick from to reach the largest audience for your products and services.

To get in touch, contact us at info[at]saurenergy.com

Or Call at 9891147599 / 8802315631

Facebook Twitter Instagram YouTube LinkedIn WhatsApp
Latest News
  • ADB, ACWA Ink $51Mn Loan For Uzbekistan Wind-BESS Project
  • Saudi Arabia Breaks Battery Storage Cost Barriers with $73-75/kWh Milestone
  • Kazakhstan, AIIB Ink $6 Bn Green Energy & Infrastructure Pact
  • ACWA Power, Syria Ink Deal to Develop 2.5 GW Solar, Wind Projects
  • EGP 136.3 bn Plan to Boost Renewable Energy and Electricity Sector in Egypt
SAURENERGY NEWSLETTER

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

    [mc4wp_checkbox]

    © 2025 Saurenergy International.

    Type above and press Enter to search. Press Esc to cancel.

    ar العربيةzh-CN 简体中文en English
    en English
    Newsletter Subscription

      [mc4wp_checkbox]