Renewable Energy StoriesRenewable Energy Stories
  • Home
  • Solar News
    • Utility Scale
    • Rooftop Solar
    • Manufacturing
  • Other Renewables
    • Wind Energy
    • Biofuels
    • Hydro Power
    • Others
  • Storage
    • Lithium-Ion
    • Large Storage (100 kW+)
    • Small Storage
    • Battery Technology
  • Research
  • Finance
  • Events
  • Advertise
Facebook Twitter Instagram
India Edition | South East Asia Edition
Facebook Twitter LinkedIn
Renewable Energy StoriesRenewable Energy Stories
  • Home
  • Solar News
    • Utility Scale
    • Rooftop Solar
    • Manufacturing
  • Other Renewables
    • Wind Energy
    • Biofuels
    • Hydro Power
    • Others
  • Storage
    • Lithium-Ion
    • Large Storage (100 kW+)
    • Small Storage
    • Battery Technology
  • Research
  • Finance
  • Events
  • Advertise
Renewable Energy StoriesRenewable Energy Stories
Home » DEWA Seeks Developers For 1,600MW Solar Plus 1GW ESS Project
Solar News

DEWA Seeks Developers For 1,600MW Solar Plus 1GW ESS Project

By Chitrika Fri, Mar 7th, 2025
Dubai's DEWA Records Strong First Quarter Performance
Dubai's DEWA Records Strong First Quarter Performance
Share
Facebook Twitter LinkedIn Pinterest Email

Dubai Electricity and Water Authority (DEWA) has invited international developers to submit expressions of interest for a tender to develop the 1,600-megawatt (MW) seventh phase of the Mohammed bin Rashid Al Maktoum Solar Park. This phase, which is expandable to 2,000MW, will use photovoltaic solar panels and a battery energy storage system with a capacity of 1,000MW for six hours, providing a total storage capacity of 6,000 megawatt-hours (MWh). This will make it one of the world’s largest solar-plus-storage projects. The phase will be implemented under the independent power producer (IPP) model. DEWA has invited international developers or consortia to submit their expressions of interest by 21 March 2025.

The 7th phase is expected to produce 4.5 terawatt-hours of electricity annually, avoiding the burning of more than 36 billion cubic feet of natural gas. It will increase the solar park’s planned production capacity from 5,000MW to 7,260MW, raising the share of clean energy in Dubai’s energy mix from 27% to 34% by 2030. As a result, the total reduction in carbon dioxide emissions will rise from 6.5 million tonnes to approximately 8 million tonnes annually, reinforcing Dubai’s position as a global hub for sustainability and innovation in renewable energy. The 7th phase is scheduled to become operational in stages between 2027 and 2029.

According to a DEWA study, battery energy storage systems are the most cost-effective solution for energy storage and land use. Beyond grid benefits, they enhance renewable energy stability and reliability. Integrating advanced solar PV with battery storage mitigates solar intermittency and sets a replicable model for sustainable power. The solar park’s current production capacity stands at 3,460MW, with an additional 1,200MW under construction.

Submission Details

Expressions of interest should be addressed to Dubai Electricity and Water Authority, P.O. Box 564, Dubai, UAE, with an electronic copy emailed to,  P7.SolarProject2@dewa.gov.ae,  contracts@dewa.gov.ae and ippp7@deloitte.com

Developers DEWA ESS Solar tenders
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Chitrika

Related Posts

SgurrEnergy Delivers 39 GW Clean Energy Across MENA Region

November 18, 2025

Seef Properties Switches On 2.2 MWp Solar Plant at Muharraq Mall

November 17, 2025

Saudi: TotalEnergies, Toyota–Altaaqa Start 112 MW Solar Plant

November 15, 2025

Leave A Reply Cancel Reply

five × five =

Latest News
  • SgurrEnergy Delivers 39 GW Clean Energy Across MENA Region
  • Seef Properties Switches On 2.2 MWp Solar Plant at Muharraq Mall
  • Saudi: TotalEnergies, Toyota–Altaaqa Start 112 MW Solar Plant
  • Masdar-Backed Terra-Gen Commissions 238.5 MW Wind Project in Texas
  • TAQA Reports AED 42.7 Bn Revenue, Net Profit Down 4%
Solar News

SgurrEnergy Delivers 39 GW Clean Energy Across MENA Region

November 18, 2025

Seef Properties Switches On 2.2 MWp Solar Plant at Muharraq Mall

November 17, 2025

Saudi: TotalEnergies, Toyota–Altaaqa Start 112 MW Solar Plant

November 15, 2025

TAQA Reports AED 42.7 Bn Revenue, Net Profit Down 4%

November 13, 2025
ADVERTISE WITH US

We are the no.1 B2B solar media in India. With SaurEnergy, you have a full menu of options to pick from to reach the largest audience for your products and services.

To get in touch, contact us at info[at]saurenergy.com

Or Call at 9891147599 / 8802315631

Facebook Twitter Instagram YouTube LinkedIn WhatsApp
Latest News
  • SgurrEnergy Delivers 39 GW Clean Energy Across MENA Region
  • Seef Properties Switches On 2.2 MWp Solar Plant at Muharraq Mall
  • Saudi: TotalEnergies, Toyota–Altaaqa Start 112 MW Solar Plant
  • Masdar-Backed Terra-Gen Commissions 238.5 MW Wind Project in Texas
  • TAQA Reports AED 42.7 Bn Revenue, Net Profit Down 4%
SAURENERGY NEWSLETTER

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

    [mc4wp_checkbox]

    © 2025 Saurenergy International.

    Type above and press Enter to search. Press Esc to cancel.

    Newsletter Subscription

      [mc4wp_checkbox]