Renewable Energy StoriesRenewable Energy Stories
  • Home
  • Solar News
    • Utility Scale
    • Rooftop Solar
    • Manufacturing
  • Other Renewables
    • Wind Energy
    • Biofuels
    • Hydro Power
    • Others
  • Storage
    • Lithium-Ion
    • Large Storage (100 kW+)
    • Small Storage
    • Battery Technology
  • Research
  • Finance
  • Events
  • Advertise
Facebook Twitter Instagram
India Edition | South East Asia Edition
Facebook Twitter LinkedIn
Renewable Energy StoriesRenewable Energy Stories
  • Home
  • Solar News
    • Utility Scale
    • Rooftop Solar
    • Manufacturing
  • Other Renewables
    • Wind Energy
    • Biofuels
    • Hydro Power
    • Others
  • Storage
    • Lithium-Ion
    • Large Storage (100 kW+)
    • Small Storage
    • Battery Technology
  • Research
  • Finance
  • Events
  • Advertise
Renewable Energy StoriesRenewable Energy Stories
Home » Nordex Receives 80 MW Order From Borusan EnBW Enerji In Türkiye
Wind Energy

Nordex Receives 80 MW Order From Borusan EnBW Enerji In Türkiye

By Chitrika Tue, Apr 16th, 2024
India-UAE Talks: Strengthening Bonds Amidst Global Uncertainty
India-UAE Talks: Strengthening Bonds Amidst Global Uncertainty
Share
Facebook Twitter LinkedIn Pinterest Email

Nordex has received an order to supply 14 N163/5.X turbines from Borusan EnBW Enerji, a wind energy project operator and developer in Türkiye.

At the end of March, Wind power company  Nordex Group received an order to supply 14 N163/5.X turbines from Borusan EnBW Enerji. Enerji is a developer and operator of wind energy projects in Türkiye. The Delta4000 series turbines are projected for the 80 MW Pelit wind farm in the Sivas Province. The contract also includes a Premium Service for the turbines for 10 years.

Based on the contract Delta4000 series turbines are expected to be used for the 80 MW Pelit wind farm in the Sivas Province. The contract also includes a Premium Service for the turbines for 10 years. The order follows a 36 MW order Borusan EnBW Enerji placed with the Nordex Group for the Balabanli Extension II wind farm in December 2023, comprising 6 N163/5.X turbines.

The Pelit wind farm project is located on a mountain ridge, approximately 20 km northwest of the Sivas Gürün district. The Nordex Group plans to install a cold climate version of the turbines, which will be on tubular steel towers and have hub heights of 108 meters. Borusan EnBW Enerji also ordered the Nordex Advanced Anti-icing System to reduce ice formation on the rotor blades.

Already this year, the Nordex Group plans to deliver and install the 6 N163/5.X turbines from the contract awarded in 2023 for the Balabanli Extension II project near Tekirdağ in the East Thrace region of Türkiye. The Delta4000 turbines, also in the cold climate version, will be installed on tubular steel towers with hub heights of 118 meters.

Ender Ozatay, Managing Director Nordex Türkiye, says, “As the market leader since 2017, the Nordex Group is proud to partner once again with Borusan EnBW Enerji, the second biggest investor in installed capacity in Türkiye.”

General Manager of Borusan EnBW Enerji, Enis Amasyalı, “Borusan EnBW Enerji is excited to embark on these transformative wind energy projects that signify our dedication to advancing renewable energy infrastructure in Türkiye. These two projects increase our installed power from renewable energy to 934 MW.”

Borusan EnBW Enerji Energy Power Plants Assistant General Manager, Evren Aktaş explains: “Our Balabanlı Project will be put into operation in the fourth quarter of 2024, and our Pelit Project in the 3rd quarter of 2025. We are happy to be working with the Nordex Group once again, with their extensive installation experience and a strong service team in Türkiye, for these projects.”

Balabanli Extension II Borusan EnBW Enerji Delta4000 Ender Ozatay Evren Aktaş Nordex Pelit wind farm Sivas Gürün district Türkiye
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Chitrika

Related Posts

Turkiye and UAE Strengthen Renewable Ties with $1 Billion Nigde Bor Solar Power Project

October 16, 2025

Envision Energy Secures Major Supply Deal for Kazakhstan’s 1 GW Mirny Wind Farm

October 6, 2025

Envision, Yildizlar Partner On 232 MW Wind Project in Turkey

September 4, 2025

Leave A Reply Cancel Reply

three × 5 =

Latest News
  • Turkiye and UAE Strengthen Renewable Ties with $1 Billion Nigde Bor Solar Power Project
  • Trina Storage Unveils 6.25 MWh+ESS in Saudi Arabia
  • L&T Wins Major Grid Infrastructure Orders for Power T&D Business
  • FAB Issues $20M Blue Bond to Back Renewable-Powered Water Projects
  • EWEC Awards 1.5 GW Khazna Solar Project to ENGIE and Masdar
Solar News

Turkiye and UAE Strengthen Renewable Ties with $1 Billion Nigde Bor Solar Power Project

October 16, 2025

L&T Wins Major Grid Infrastructure Orders for Power T&D Business

October 13, 2025

FAB Issues $20M Blue Bond to Back Renewable-Powered Water Projects

October 10, 2025

EWEC Awards 1.5 GW Khazna Solar Project to ENGIE and Masdar

October 10, 2025
ADVERTISE WITH US

We are the no.1 B2B solar media in India. With SaurEnergy, you have a full menu of options to pick from to reach the largest audience for your products and services.

To get in touch, contact us at info[at]saurenergy.com

Or Call at 9891147599 / 8802315631

Facebook Twitter Instagram YouTube LinkedIn WhatsApp
Latest News
  • Turkiye and UAE Strengthen Renewable Ties with $1 Billion Nigde Bor Solar Power Project
  • Trina Storage Unveils 6.25 MWh+ESS in Saudi Arabia
  • L&T Wins Major Grid Infrastructure Orders for Power T&D Business
  • FAB Issues $20M Blue Bond to Back Renewable-Powered Water Projects
  • EWEC Awards 1.5 GW Khazna Solar Project to ENGIE and Masdar
SAURENERGY NEWSLETTER

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

    [mc4wp_checkbox]

    © 2025 Saurenergy International.

    Type above and press Enter to search. Press Esc to cancel.

    Newsletter Subscription

      [mc4wp_checkbox]