Renewable Energy StoriesRenewable Energy Stories
  • Home
  • Solar News
    • Utility Scale
    • Rooftop Solar
    • Manufacturing
  • Other Renewables
    • Wind Energy
    • Biofuels
    • Hydro Power
    • Others
  • Storage
    • Lithium-Ion
    • Large Storage (100 kW+)
    • Small Storage
    • Battery Technology
  • Research
  • Finance
  • Events
  • Advertise
Facebook Twitter Instagram
India Edition | South East Asia Edition
Facebook Twitter LinkedIn
Renewable Energy StoriesRenewable Energy Stories
  • Home
  • Solar News
    • Utility Scale
    • Rooftop Solar
    • Manufacturing
  • Other Renewables
    • Wind Energy
    • Biofuels
    • Hydro Power
    • Others
  • Storage
    • Lithium-Ion
    • Large Storage (100 kW+)
    • Small Storage
    • Battery Technology
  • Research
  • Finance
  • Events
  • Advertise
Renewable Energy StoriesRenewable Energy Stories
Home » Nordex Receives 80 MW Order From Borusan EnBW Enerji In Türkiye
Wind Energy

Nordex Receives 80 MW Order From Borusan EnBW Enerji In Türkiye

By Chitrika Tue, Apr 16th, 2024
India-UAE Talks: Strengthening Bonds Amidst Global Uncertainty
India-UAE Talks: Strengthening Bonds Amidst Global Uncertainty
Share
Facebook Twitter LinkedIn Pinterest Email

Nordex has received an order to supply 14 N163/5.X turbines from Borusan EnBW Enerji, a wind energy project operator and developer in Türkiye.

At the end of March, Wind power company  Nordex Group received an order to supply 14 N163/5.X turbines from Borusan EnBW Enerji. Enerji is a developer and operator of wind energy projects in Türkiye. The Delta4000 series turbines are projected for the 80 MW Pelit wind farm in the Sivas Province. The contract also includes a Premium Service for the turbines for 10 years.

Based on the contract Delta4000 series turbines are expected to be used for the 80 MW Pelit wind farm in the Sivas Province. The contract also includes a Premium Service for the turbines for 10 years. The order follows a 36 MW order Borusan EnBW Enerji placed with the Nordex Group for the Balabanli Extension II wind farm in December 2023, comprising 6 N163/5.X turbines.

The Pelit wind farm project is located on a mountain ridge, approximately 20 km northwest of the Sivas Gürün district. The Nordex Group plans to install a cold climate version of the turbines, which will be on tubular steel towers and have hub heights of 108 meters. Borusan EnBW Enerji also ordered the Nordex Advanced Anti-icing System to reduce ice formation on the rotor blades.

Already this year, the Nordex Group plans to deliver and install the 6 N163/5.X turbines from the contract awarded in 2023 for the Balabanli Extension II project near Tekirdağ in the East Thrace region of Türkiye. The Delta4000 turbines, also in the cold climate version, will be installed on tubular steel towers with hub heights of 118 meters.

Ender Ozatay, Managing Director Nordex Türkiye, says, “As the market leader since 2017, the Nordex Group is proud to partner once again with Borusan EnBW Enerji, the second biggest investor in installed capacity in Türkiye.”

General Manager of Borusan EnBW Enerji, Enis Amasyalı, “Borusan EnBW Enerji is excited to embark on these transformative wind energy projects that signify our dedication to advancing renewable energy infrastructure in Türkiye. These two projects increase our installed power from renewable energy to 934 MW.”

Borusan EnBW Enerji Energy Power Plants Assistant General Manager, Evren Aktaş explains: “Our Balabanlı Project will be put into operation in the fourth quarter of 2024, and our Pelit Project in the 3rd quarter of 2025. We are happy to be working with the Nordex Group once again, with their extensive installation experience and a strong service team in Türkiye, for these projects.”

Balabanli Extension II Borusan EnBW Enerji Delta4000 Ender Ozatay Evren Aktaş Nordex Pelit wind farm Sivas Gürün district Türkiye
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Chitrika

Related Posts

Wind and Sun Add Up in Egypt’s Energy Mix

June 3, 2025

Morocco to Add 731 km of Power Lines and Expand RE

May 26, 2025

Oman Plans to Boost its Power Grid Over the Next Decade

May 23, 2025

Leave A Reply Cancel Reply

eleven − 1 =

Latest News
  • Egypt Looks to Expand Solar and Smart Grid Plans with China
  • New Cooling Tech Raises Solar Cells Power And Longevity: Study
  • Sharjah Gas Plant Now Runs on Solar Power
  • Everllence Expands Low-Emission Energy Projects Across the Gulf
  • More Rooftops in Dubai Now Solar Powered
Solar News

Egypt Looks to Expand Solar and Smart Grid Plans with China

June 30, 2025

New Cooling Tech Raises Solar Cells Power And Longevity: Study

June 27, 2025

Sharjah Gas Plant Now Runs on Solar Power

June 26, 2025

More Rooftops in Dubai Now Solar Powered

June 24, 2025
ADVERTISE WITH US

We are the no.1 B2B solar media in India. With SaurEnergy, you have a full menu of options to pick from to reach the largest audience for your products and services.

To get in touch, contact us at info[at]saurenergy.com

Or Call at 9891147599 / 8802315631

Facebook Twitter Instagram YouTube LinkedIn WhatsApp
Latest News
  • Egypt Looks to Expand Solar and Smart Grid Plans with China
  • New Cooling Tech Raises Solar Cells Power And Longevity: Study
  • Sharjah Gas Plant Now Runs on Solar Power
  • Everllence Expands Low-Emission Energy Projects Across the Gulf
  • More Rooftops in Dubai Now Solar Powered
SAURENERGY NEWSLETTER

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

    [mc4wp_checkbox]

    © 2025 Saurenergy International.

    Type above and press Enter to search. Press Esc to cancel.

    Newsletter Subscription

      [mc4wp_checkbox]