Renewable Energy StoriesRenewable Energy Stories
  • Home
  • Solar News
    • Utility Scale
    • Rooftop Solar
    • Manufacturing
  • Other Renewables
    • Wind Energy
    • Biofuels
    • Hydro Power
    • Others
  • Storage
    • Lithium-Ion
    • Large Storage (100 kW+)
    • Small Storage
    • Battery Technology
  • Research
  • Finance
  • Events
  • Advertise
Facebook Twitter Instagram
India Edition | South East Asia Edition
Facebook Twitter LinkedIn
Renewable Energy StoriesRenewable Energy Stories
  • Home
  • Solar News
    • Utility Scale
    • Rooftop Solar
    • Manufacturing
  • Other Renewables
    • Wind Energy
    • Biofuels
    • Hydro Power
    • Others
  • Storage
    • Lithium-Ion
    • Large Storage (100 kW+)
    • Small Storage
    • Battery Technology
  • Research
  • Finance
  • Events
  • Advertise
Renewable Energy StoriesRenewable Energy Stories
Home » QatarEnergy, Samsung C&T Ink Deal To Build 2 GW Dukhan Solar Plant
Solar News

QatarEnergy, Samsung C&T Ink Deal To Build 2 GW Dukhan Solar Plant

By Chitrika Wed, Sep 17th, 2025
QatarEnergy, Samsung C&T ink deal for 2 GW Dukhan solar plant
QatarEnergy, Samsung C&T ink deal for 2 GW Dukhan solar plant
Share
Facebook Twitter LinkedIn Pinterest Email

QatarEnergy signed an agreement with Samsung C&T’s Engineering & Construction Group (Samsung C&T) for the construction of a world-scale solar power plant in Dukhan, about 80 kilometers west of Doha.

The Dukhan solar power plant, one of the largest in the world, will be developed in two phases, reaching a total electricity generation capacity of 2,000 megawatts (MW) by mid-2029. Once completed, it will double Qatar’s solar power production capacity, contributing significantly to the country’s renewable energy goals.

The agreement was signed by His Excellency Saad Sherida Al-Kaabi, the Minister of State for Energy Affairs, the President and CEO of QatarEnergy, and Sechul Oh, the President & CEO of Samsung C&T, during a special ceremony held at QatarEnergy’s Headquarters in Doha. The event was attended by Abdulla bin Ali Al-Theyab, the President of Kahramaa, and senior executives from both companies.

Leadership View

Commenting on this occasion, Minister Al-Kaabi said: “This agreement is an important milestone in our effort to manage the environment in a manner that balances economic and social development with environmental protection, as stipulated by Qatar National Vision 2030. It also supports one of the key goals of QatarEnergy’s Sustainability Strategy, which is to generate more than 4,000 megawatts of renewable energy by 2030.”

Minister Al-Kaabi added: “When completed, the Dukhan solar power plant, along with Al-Kharsaah, Mesaieed, and Ras Laffan solar power plants, will help reduce carbon dioxide emissions by about 4.7 million tons annually, while contributing up to 30% of Qatar’s total peak electricity demand. We are pleased to collaborate with Samsung C&T to help achieve this vision.”

The Dukhan solar power plant will begin the first phase of production by dispatching 1,000 MW of power to the KAHRAMAA grid towards the end of 2028. The new plant will utilize a solar tracker system and will enhance efficiency by installing inverters capable of operating flawlessly in a high-temperature environment.​

Al-Kaabi Dukhan solar plant Saad Sherida al-Kaabi Samsung C&T Solar Plant
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Chitrika

Related Posts

Hitachi Ships 14HVDC Transformers, For 9GW Saudi Interconnection

February 25, 2026

UAE: Bondada Ties Up With Bryanston on Green Data Centres

February 12, 2026

GULF Secures $1.9 Bn Financing for 939 MW Renewable Projects

February 11, 2026

Leave A Reply Cancel Reply

17 + 16 =

Latest News
  • Hitachi Ships 14HVDC Transformers, For 9GW Saudi Interconnection
  • UAE: Bondada Ties Up With Bryanston on Green Data Centres
  • GULF Secures $1.9 Bn Financing for 939 MW Renewable Projects
  • Sineng Electric Wins PV Inverter Supply Deal for Saudi Arabia’s 3 GW PIF 6 Solar Cluster
  • Oman’s Largest Polysilicon Plant Comes Online, Backing 40 GW of Solar Manufacturing

Subscribe to Updates

Get the latest news updates, top stories, and breaking headlines delivered to your inbox.

Solar News

Hitachi Ships 14HVDC Transformers, For 9GW Saudi Interconnection

February 25, 2026

UAE: Bondada Ties Up With Bryanston on Green Data Centres

February 12, 2026

GULF Secures $1.9 Bn Financing for 939 MW Renewable Projects

February 11, 2026

Sineng Electric Wins PV Inverter Supply Deal for Saudi Arabia’s 3 GW PIF 6 Solar Cluster

February 10, 2026
ADVERTISE WITH US

We are the no.1 B2B solar media in India. With SaurEnergy, you have a full menu of options to pick from to reach the largest audience for your products and services.

To get in touch, contact us at info[at]saurenergy.com

Or Call at 9891147599 / 8802315631

Facebook Twitter Instagram YouTube LinkedIn WhatsApp
Latest News
  • Hitachi Ships 14HVDC Transformers, For 9GW Saudi Interconnection
  • UAE: Bondada Ties Up With Bryanston on Green Data Centres
  • GULF Secures $1.9 Bn Financing for 939 MW Renewable Projects
  • Sineng Electric Wins PV Inverter Supply Deal for Saudi Arabia’s 3 GW PIF 6 Solar Cluster
  • Oman’s Largest Polysilicon Plant Comes Online, Backing 40 GW of Solar Manufacturing

Subscribe to Updates

Get the latest news updates, top stories, and breaking headlines delivered to your inbox.

© 2026 Saurenergy International.

Type above and press Enter to search. Press Esc to cancel.

Newsletter Subscription

Subscribe to Updates

Get the latest news updates, top stories, and breaking headlines delivered to your inbox.