Renewable Energy StoriesRenewable Energy Stories
  • Home
  • Solar News
    • Utility Scale
    • Rooftop Solar
    • Manufacturing
  • Other Renewables
    • Wind Energy
    • Biofuels
    • Hydro Power
    • Others
  • Storage
    • Lithium-Ion
    • Large Storage (100 kW+)
    • Small Storage
    • Battery Technology
  • Research
  • Finance
  • Events
  • Advertise
Facebook Twitter Instagram
India Edition | South East Asia Edition
Facebook Twitter LinkedIn
Renewable Energy StoriesRenewable Energy Stories
  • Home
  • Solar News
    • Utility Scale
    • Rooftop Solar
    • Manufacturing
  • Other Renewables
    • Wind Energy
    • Biofuels
    • Hydro Power
    • Others
  • Storage
    • Lithium-Ion
    • Large Storage (100 kW+)
    • Small Storage
    • Battery Technology
  • Research
  • Finance
  • Events
  • Advertise
Renewable Energy StoriesRenewable Energy Stories
Home » Dubai: DEWA Adds 600-MW From 5th Phase Of Al Maktoum Solar Park
Solar News

Dubai: DEWA Adds 600-MW From 5th Phase Of Al Maktoum Solar Park

By Saurenergy International Thu, Nov 3rd, 2022
Yemen tenders
Yemen Solicits Bids for Four Solar Projects
Share
Facebook Twitter LinkedIn Pinterest Email

Saeed Mohammed Al Tayer, MD&CEO of Dubai Electricity and Water Authority (DEWA), has said that DEWA has added 300 MW of solar PV this year from the 5th phase of the Mohammed bin Rashid Al Maktoum Solar Park.

The Solar Park will have a green power generation capacity of 5,000 MW by 2030. The project is the world’s largest single-site solar park employing the Independent Power Producer model. The 5th phase, which is presently being developed, will have a total capacity of 900MW through an investment of AED 2 billion. The project will be operationalised in phases until 2023.

Saeed Mohammed Al Tayer, stated on the feat, “We strive to keep pace with demand by implementing pioneering projects to diversify sources of energy production to include various clean and renewable energy sources and technologies in Dubai and expand the Mohammed bin Rashid Al Maktoum Solar Park projects.”

DEWA said in a tweet, “DEWA has added 300MW of photovoltaic solar energy in 2022 from the 5th phase of the Mohammed bin Rashid Al Maktoum Solar Park. This adds to the 300MW that became operational last year from the 5th phase.”

The CEO also held that this will help achieve the Dubai Clean Energy Strategy 2050 and the Dubai Net Zero Carbon Emissions Strategy 2050 to provide 100% of Dubai’s total power production capacity from clean energy sources by 2050.

Al Tayer mentioned that the current clean energy production from the solar park has reached 1,827MW through solar PV panels. DEWA is developing other projects at the site of 1,033-MW employing both PV and Concentrated Solar Power.

Today, the clean energy share in Dubai is 12.8% of the installed capacity. The authorities look to step-up the renewable’s share to 14% by the end of this year only.

The 4th phase of the solar park has a capacity of 950 MW employing three hybrid technologies that will provide clean and green energy for around 320,000 residences reducing about 1.6 million tonnes of CO2 emissions per year.

As far as the 6th Phase is concerned, DEWA said that it has invited global developers to submit Expressions of Interest for the implementation of the phase which will also be based on the IPP model. The authority held that the sixth phase will be operationalised in stages beginning from the third quarter of 2025.

AED 2 billion investment Dubai Clean Energy Strategy 2050 Dubai Electricity and Water Authority Dubai Net Zero Carbon Emissions Strategy 2050 Independent Power Producer Mohammed bin Rashid Al Maktoum Solar Park Saeed Mohammed Al Tayer Solar Park
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Saurenergy International
  • Website

Related Posts

Growatt Offers New Innovation For Household-Level Solar

May 12, 2025

China’s Almaden Plans New Solar Glass Factory in Abu Dhabi

May 8, 2025

Iraq Plans to Expand Solar Energy In Multiple Provinces

May 6, 2025

Leave A Reply Cancel Reply

6 + 2 =

Latest News
  • Growatt Offers New Innovation For Household-Level Solar
  • ACWA Power Expands RE in China, Saudi Arabia, and Beyond
  • Jordan Aims to Reach RE Target Earlier Than Planned
  • China’s Almaden Plans New Solar Glass Factory in Abu Dhabi
  • BYD Ships First Batch of Energy Storage Units to Saudi Arabia
Solar News

Growatt Offers New Innovation For Household-Level Solar

May 12, 2025

China’s Almaden Plans New Solar Glass Factory in Abu Dhabi

May 8, 2025

Iraq Plans to Expand Solar Energy In Multiple Provinces

May 6, 2025

Scatec Begins Work on Egypt’s First Solar and BESS Project

May 6, 2025
ADVERTISE WITH US

We are the no.1 B2B solar media in India. With SaurEnergy, you have a full menu of options to pick from to reach the largest audience for your products and services.

To get in touch, contact us at info[at]saurenergy.com

Or Call at 9891147599 / 8802315631

Facebook Twitter Instagram YouTube LinkedIn WhatsApp
Latest News
  • Growatt Offers New Innovation For Household-Level Solar
  • ACWA Power Expands RE in China, Saudi Arabia, and Beyond
  • Jordan Aims to Reach RE Target Earlier Than Planned
  • China’s Almaden Plans New Solar Glass Factory in Abu Dhabi
  • BYD Ships First Batch of Energy Storage Units to Saudi Arabia
SAURENERGY NEWSLETTER

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

    [mc4wp_checkbox]

    © 2025 Saurenergy International.

    Type above and press Enter to search. Press Esc to cancel.

    Newsletter Subscription

      [mc4wp_checkbox]