Renewable Energy StoriesRenewable Energy Stories
  • Home
  • Solar News
    • Utility Scale
    • Rooftop Solar
    • Manufacturing
  • Other Renewables
    • Wind Energy
    • Biofuels
    • Hydro Power
    • Others
  • Storage
    • Lithium-Ion
    • Large Storage (100 kW+)
    • Small Storage
    • Battery Technology
  • Research
  • Finance
  • Events
  • Advertise
Facebook Twitter Instagram
India Edition | South East Asia Edition
Facebook Twitter LinkedIn
Renewable Energy StoriesRenewable Energy Stories
  • Home
  • Solar News
    • Utility Scale
    • Rooftop Solar
    • Manufacturing
  • Other Renewables
    • Wind Energy
    • Biofuels
    • Hydro Power
    • Others
  • Storage
    • Lithium-Ion
    • Large Storage (100 kW+)
    • Small Storage
    • Battery Technology
  • Research
  • Finance
  • Events
  • Advertise
Renewable Energy StoriesRenewable Energy Stories
Home ยป UAE: SEWA Opens New Kalba Power Station To Enhance Energy Services
Solar News

UAE: SEWA Opens New Kalba Power Station To Enhance Energy Services

By Chitrika Mon, Jun 10th, 2024
SEWA Opens New Kalba Power Station To Enhance Energy Services
SEWA Opens New Kalba Power Station To Enhance Energy Services
Share
Facebook Twitter LinkedIn Pinterest Email

The Sharjah Electricity, Water, and Gas Authority (SEWA) recently commencement operations at the Kalba commercial power transmission station of 33/11 kV.

This initiative was a part of the authority’s ongoing efforts to enhance power transmission and distribution networks across all areas, providing the best services to the residents of Sharjah. The total cost of constructing the station amounted to 55 million dirhams, with all testing and commissioning processes completed successfully.

Engineer Youssef Mohammed Al Hammadi, Director of the Kalba Department at SEWA, stated that the new 33/11 kV commercial substation in Kalba is the main source of electrical supply for the region and neighboring areas, including the commercial and industrial zones, Al Qurm, Kalba Mall waterfront, Victoria School, and the Khatm Al Melahia border point.

He emphasized the authority’s commitment to executing projects to the highest standards and within a specified timeline, ensuring the best services for development projects across different areas of Sharjah. This aligns with the directives of His Highness Sheikh Dr. Sultan bin Mohammed Al Qasimi, Supreme Council Member and Ruler of Sharjah, to continuously improve services.

Al Hammadi pointed out that the station was constructed, connected to the network, and made operational according to the highest safety and security standards. It is equipped with advanced systems to ensure quality and efficiency. The station has a capacity of 60 MVA and includes three transformers, each with a capacity of 20 MVA. The latest technologies were used in the station, with 33 kV cables extending 25 km and 11 kV cables extending 12 km. The station features a BMS (Building Management System) that includes access control, surveillance cameras, air conditioning systems, room temperature monitoring, and fire suppression systems.

Al Hammadi SEWA transmission system Youssef Mohammed Al Hammadi
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Chitrika

Related Posts

UAE Solar Capacity To Reach 32.3GW By 2035, Forecasts GlobalData

March 20, 2026

Sahaj Solar Plans 750 MW Solar Panel Manufacturing Plant in UAE

March 10, 2026

Hitachi Ships 14HVDC Transformers, For 9GW Saudi Interconnection

February 25, 2026

Leave A Reply Cancel Reply

8 − seven =

Latest News
  • UAE Solar Capacity To Reach 32.3GW By 2035, Forecasts GlobalData
  • Sahaj Solar Plans 750 MW Solar Panel Manufacturing Plant in UAE
  • Hitachi Ships 14HVDC Transformers, For 9GW Saudi Interconnection
  • UAE: Bondada Ties Up With Bryanston on Green Data Centres
  • GULF Secures $1.9 Bn Financing for 939 MW Renewable Projects

Subscribe to Updates

Get the latest news updates, top stories, and breaking headlines delivered to your inbox.

Solar News

UAE Solar Capacity To Reach 32.3GW By 2035, Forecasts GlobalData

March 20, 2026

Sahaj Solar Plans 750 MW Solar Panel Manufacturing Plant in UAE

March 10, 2026

Hitachi Ships 14HVDC Transformers, For 9GW Saudi Interconnection

February 25, 2026

UAE: Bondada Ties Up With Bryanston on Green Data Centres

February 12, 2026
ADVERTISE WITH US

We are the no.1 B2B solar media in India. With SaurEnergy, you have a full menu of options to pick from to reach the largest audience for your products and services.

To get in touch, contact us at info[at]saurenergy.com

Or Call at 9891147599 / 8802315631

Facebook Twitter Instagram YouTube LinkedIn WhatsApp
Latest News
  • UAE Solar Capacity To Reach 32.3GW By 2035, Forecasts GlobalData
  • Sahaj Solar Plans 750 MW Solar Panel Manufacturing Plant in UAE
  • Hitachi Ships 14HVDC Transformers, For 9GW Saudi Interconnection
  • UAE: Bondada Ties Up With Bryanston on Green Data Centres
  • GULF Secures $1.9 Bn Financing for 939 MW Renewable Projects

Subscribe to Updates

Get the latest news updates, top stories, and breaking headlines delivered to your inbox.

© 2026 Saurenergy International.

Type above and press Enter to search. Press Esc to cancel.

Newsletter Subscription

Subscribe to Updates

Get the latest news updates, top stories, and breaking headlines delivered to your inbox.