Renewable Energy StoriesRenewable Energy Stories
  • Home
  • Solar News
    • Utility Scale
    • Rooftop Solar
    • Manufacturing
  • Other Renewables
    • Wind Energy
    • Biofuels
    • Hydro Power
    • Others
  • Storage
    • Lithium-Ion
    • Large Storage (100 kW+)
    • Small Storage
    • Battery Technology
  • Research
  • Finance
  • Events
  • Advertise
Facebook Twitter Instagram
India Edition | South East Asia Edition
Facebook Twitter LinkedIn
Renewable Energy StoriesRenewable Energy Stories
  • Home
  • Solar News
    • Utility Scale
    • Rooftop Solar
    • Manufacturing
  • Other Renewables
    • Wind Energy
    • Biofuels
    • Hydro Power
    • Others
  • Storage
    • Lithium-Ion
    • Large Storage (100 kW+)
    • Small Storage
    • Battery Technology
  • Research
  • Finance
  • Events
  • Advertise
Renewable Energy StoriesRenewable Energy Stories
Home » EGA to Build Region’s First Renewable-Powered Data Centers
Other Renewables

EGA to Build Region’s First Renewable-Powered Data Centers

By Rashida Wed, Mar 6th, 2024
Share
Facebook Twitter LinkedIn Pinterest Email

Emirates Global Aluminium (EGA) has announced the construction of the region’s inaugural 100% renewable energy powered industrial data centres at its Jebel Ali and Al Taweelah sites.

This strategic move not only signifies a remarkable milestone for the United Arab Emirates’ industrial landscape but also demonstrates EGA’s commitment to innovation and sustainability.

The establishment of these cutting-edge data centres will revolutionize EGA’s operations, enabling the integration of artificial intelligence (AI) and automation solutions at the core of its industrial processes. By leveraging real-time AI-optimized power and cooling management alongside the latest computer infrastructure, EGA anticipates a substantial 50% reduction in its total IT energy consumption.

The project is being implemented in collaboration with local technology provider Scientechnic and the EGA’s digital roadmap is expected to reshape its operations through the adoption of Industry 4.0 principles and broader digital transformation. The data centres, built to the Uptime Institute’s Tier III standard, will bolster the resilience of EGA’s computing infrastructure while aligning with global benchmarks for data centre efficiency.

EGA’s CEO Abdulnasser Bin Kalban stressed upon the company’s commitment to sustainability and added, “The construction of these state-of-the-art data centres exemplifies EGA’s endeavor to foster a thriving manufacturing innovation ecosystem in the UAE.”

Carlo K Nizam, EGA’s Chief Digital Officer, also emphasized on the pivotal role of the new data centres in enhancing the resilience and sustainability of the company’s digital manufacturing platform. With a focus on data-intensive AI and advanced automation solutions, EGA aims to realize its vision of self-optimizing, AI-driven plant operations.

Further, EGA’s collaboration with Microsoft UAE has seen the migration of two-thirds of its server and applications infrastructure to the Microsoft Azure Hybrid Cloud. This hybrid cloud model, endorsed by the UAE Ministry of Industry and Advanced Technology’s Industry 4.0 Champions Network, significantly augments EGA’s data processing capacity while optimizing costs.

With its target towards innovation and sustainability, EGA continues to reinforce its position as a global leader in aluminium production while championing the UAE’s transition towards a knowledge-based economy.

Data centers EGA (Emirates Global Aluminium) UAE (United Arab Emirates)
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Rashida
  • Website

Related Posts

Kuwait Grid Under Pressure: Rystad Warns Renewable Target Will Slip Beyond 2030

September 16, 2025

Kazakhstan, AIIB Ink $6 Bn Green Energy & Infrastructure Pact

September 5, 2025

EGP 136.3 bn Plan to Boost Renewable Energy and Electricity Sector in Egypt

September 4, 2025

Leave A Reply Cancel Reply

2 + 18 =

Latest News
  • Saudi Arabia Seeks Bidders For 5.3 GW Solar, Wind Projects
  • Kuwait Grid Under Pressure: Rystad Warns Renewable Target Will Slip Beyond 2030
  • Egypt, Kazakhstan Join 13 Nations in EBRD $634 Mn Green Push
  • N2OFF Backs BESS Addition to 115 MWp Solar Project in Germany
  • Scientists Boost Perovskite-Silicon Solar Cells To 33.1% Efficiency
Solar News

Saudi Arabia Seeks Bidders For 5.3 GW Solar, Wind Projects

September 16, 2025

Kuwait Grid Under Pressure: Rystad Warns Renewable Target Will Slip Beyond 2030

September 16, 2025

Egypt, Kazakhstan Join 13 Nations in EBRD $634 Mn Green Push

September 15, 2025

N2OFF Backs BESS Addition to 115 MWp Solar Project in Germany

September 11, 2025
ADVERTISE WITH US

We are the no.1 B2B solar media in India. With SaurEnergy, you have a full menu of options to pick from to reach the largest audience for your products and services.

To get in touch, contact us at info[at]saurenergy.com

Or Call at 9891147599 / 8802315631

Facebook Twitter Instagram YouTube LinkedIn WhatsApp
Latest News
  • Saudi Arabia Seeks Bidders For 5.3 GW Solar, Wind Projects
  • Kuwait Grid Under Pressure: Rystad Warns Renewable Target Will Slip Beyond 2030
  • Egypt, Kazakhstan Join 13 Nations in EBRD $634 Mn Green Push
  • N2OFF Backs BESS Addition to 115 MWp Solar Project in Germany
  • Scientists Boost Perovskite-Silicon Solar Cells To 33.1% Efficiency
SAURENERGY NEWSLETTER

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

    [mc4wp_checkbox]

    © 2025 Saurenergy International.

    Type above and press Enter to search. Press Esc to cancel.

    Newsletter Subscription

      [mc4wp_checkbox]